Golden fruit

Plessisville, Quebec | New plant & energy optimization | 2015-2021

Optimized infrastructures for sustainable production

Building a new plant required a turnkey solution for Fruit d'Or. The expansion of its activities called for an integrated approach. The aim was to manage energy, heat recovery and control in industrial environments. Our expertise, responsiveness and flexibility enabled production to resume rapidly.

High-performancesystem withheat recovery

We have designed and installed high-performance mechanical systems for precise thermal control. This solution guarantees optimum energy efficiency

Our intervention

At the same time, we have taken on several energy-saving projects:

Energy reduction and carbon footprint minimized

Benefits for Fruit d'Or

This performance positions Fruit d'Or as a model of energy efficiency in the agri-food processing sector.

Excellence in industrial energy management

This project demonstrates our expertise in heating, ventilation, energy recovery and project management. Our comprehensive support, including TEQ subsidies, maximizes return on investment.

Your company can also optimize its infrastructure while maximizing energy efficiency. Environmental efficiency is also optimized.

Optimize your industrial energyinfrastructures

Join the agri-food leaders who are turning their energy challenges into sustainable advantages. Fruit d'Or saves money with our integrated solutions. Your company deserves this performance to optimize production and reduce its environmental footprint.

8 areas of expertise at your service since 1993

Tight constraints? Complex challenge? Our integrated approach transforms urgency into operational performance.

fleche-icon-1

Search

Please enter your search terms