Design and implementation of a heat recovery network from chillers for fresh air preheating
Design and implementation of a cooling distribution network to the reverse osmosis system
Design and implementation of a network for the ventilation system of the new mechanical room and upgrade of the existing factory
Design and installation of a heating distribution network to the thermiser and the rooftop ventilation unit
Integration of the cold networks (old and new) to allow redundancy
Design and integration of the control and automation system with remote monitoring
Selection and installation of a new adiabatic “fluid cooler”
Complete support for the administrative preparation of the file to obtain a grant