BACK TO PROJECTS
Dairy products

Polyethnique Cheese Factory - Factory Expansion

DISCOVER THE PROJECT
Year
2020-2021
Location
Saint-Robert, Québec
IN COLLABORATION WITH
Clauger

GAINS AND BENEFITS FOR THE CUSTOMER

Substantial recurring savings in production costs
Optimized efficiency and energy consumption for the company
Reduction of the company's ecological footprint
Reduced maintenance and supervision required through remote monitoring
Modulated management of power calls throughout the year
Obtaining the TEQ energy efficiency grant

CHALLENGES

Take charge of the treatment and conditioning of the air in the production, brine, packaging, waiting rooms, etc.
Installation of a CO₂ refrigeration system to cool the brine
Heat recovery from the CO₂ system to build a hot water bank for various uses
Real-time remote data collection necessary for the follow-up of the TEQ file via our control system
Complete support for the administrative preparation of the file to obtain a grant from Transition Énergétique Québec (TEQ)

AREAS OF PRACTICE

Engineering (Design and Build)
Turnkey project management
Control and automation
Ventilation and air treatment
Refrigeration
Piping