Complete management of the factory ventilation according to CNESST rules with energy recovery
Integration of control and automation to modulate the air supply according to the demand of the welders which allows energy savings.
Design and implementation of the Soud-Air-Nergie system for welding workstations
Design and installation of the air conditioning system for the offices.
Selection and installation of a dust collector
Design and installation of a heat recovery system for the baking oven.